Looking for our e-shop? It's now at shop.airteam.euHledáte e-shop? Najdete ho na shop.airteam.eu
Interior reconfiguration

Interior reconfiguration

Cabin design

The cabin changes. The data has to follow.

Interior reconfiguration under AIR TEAM Engineering: seats, galleys, partitions and crew rest, classified, drawn and handed to production and the hangar.

  • Design (DOA)EASA.21J.849
  • Production (POA)CZ.21G.0075
Render of a galley unit in lime and brown with drawers and cupboards
Galley monument concept

What is included

  • Seats and monuments

    Reconfiguration with the data that covers it.

  • Stowage, galleys and wardrobes

    Custom units: stowage and closets, galleys, bulkheads, foot rests, cupboards.

  • Partitions and class dividers

    Windscreens, movable class dividers and custom partitions.

  • Crew-rest modules

    Crew-rest modules and curtains on curved or straight rails.

  • Redelivery and lessors

    Packs for when the lease needs them.

  • Own production

    Monuments built in house under Part 21G.

Typical deliverables

  1. 1Concept and installation drawings
  2. 2Classification and approved data
  3. 3Manufacturing data for the monuments
  4. 4Installation instructions for the hangar
  • Grey cabin partition monument on a white background
    Partition monument
  • Black crew-rest curtain on a ceiling rail
    Crew-rest curtain
  • Cream curtains hanging from a curved ceiling rail
    Curved curtain rail
AIR TEAM technician working on a King Air propeller in the Kunovice hangar

Need design data or a certified part?

Send the aircraft, the change or the drawing. We reply within 1 business day.

Alex Mudrych

Contact

Alex Mudrych

Sales Director, DOA & Interior

alex.mudrych@airteam.eu
Send project details